AECOM (legacy Shimmick) is performing the Silver Lake Reservoir Complex Storage No. 6 project, which consists of engineering, excavation, fine grade, reinforcing, concrete placement, hydrostatic testing and chlorination of the reservoir and inlet vault.

Work includes the installation of 24-inch diameter floor drain pipe, chemical piping, chemical pumps, mixers and wash down piping. Concrete for the project is produced by an on-site batch plant and thermal controls, since the concrete is considered mass concrete.

The project will be completed in 2019.