Croton Water Treatment Plant

New York, New York, United States

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Environment

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Infrastructure & Facilities

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges & Tunnels

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Mass Transit

    Ports & Marine

    Transportation decarbonization

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • AECOM Capital

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental Contracting

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Fabrication

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

AECOM, as part of a joint venture, is working with the NYC Department of Environmental Protection to provide Construction Management Services for New York City’s first water underground treatment plant. This 290 million-gallon-per-day plant is being constructed completely underground beneath Van Cortlandt Park, in the Bronx. When in operation, this plant will have the ability to treat between 20% and 30% of the daily water usage of NYC. The pre-existing golf course and driving range, under which the plant is being constructed, will be fully restored at the original grades above the roof of the completed facility. This $2.4 billion facility is a critical piece to the City’s Watershed Agreement with the Federal Government. A completed Site Preparation Construction Contract consisted of the drilling, explosive blasting and excavation of 250,000 cubic yards of soil and 950,000 cubic yards of rock to a final depth of 100 feet below surface grade. The completed Tunnel Construction Contract includes an 850 foot tunnel connecting to the New Croton Aqueduct for the raw water feed and two 4,000 foot tunnels from the Water Treatment Plant to the Jerome Avenue Reservoir.

The tunnel work also includes three shafts which are 100 feet deep to provide access for required future maintenance. The Water Treatment Plant Construction Contract consists of a water treatment plant that will contain a raw water pumping station, dissolved air flotation, UV disinfection, offices and facilities, a small process laboratory and a treated water pumping station. To date approximately 260,000 cubic yards of concrete, 60,000,000 pounds of reinforcing bars, 622,000 square feet of duct work, 32,000 feet of water pipe, 1,000 feet of an 84-inch diameter treated water tunnel, 1,300,000 feet of conduit and 8,500,000 feet of wire have been installed.