As a key construction contractor on the NOx Reduction Project, AECOM successfully executed all of the pre and post shutdown installations of the required vessels, tanks, piping, utilities, and services both above and below grade.  These plant additions allowed our customer to carryout needed modifications to their Waste Heat Recovery Units for reducing emissions of NOx to meet required environmental standards.

The nature of the “live” plant conditions challenged by the sour gas plant’s high level of H2S demanded close work coordination between all parties; AECOM and our subcontractors, and the customer’s project team and plant operations. This project was delivered with zero safety incidents.