As they introduced a new model at their plant in Swindon, U.K., Honda came to AECOM for assistance in modifying equipment at the existing facility. Drawing on our experience in the automotive manufacturing sector, AECOM worked alongside Honda’s engineers, providing design support as they updated various parts of production equipment.

 

To accommodate the new model, updates were needed for the front knuckle/strut assembly carousel, the front mount pallet – powertrain location fixture and the rear suspension assembly fixture. Special care was taken to prevent impacting existing processes and protect painted components. AECOM’s cost-effective solution preserved Honda’s simple and efficient model change processes and used lean manufacturing methodologies to prevent errors in the manufacturing process.

Learn more about AECOM and process led design